FQCN10 CWUL 072000 TECHNICAL MARINE SYNOPSIS FOR THE ST. LAWRENCE AND SAGUENAY RIVERS ISSUED BY ENVIRONMENT CANADA AT 3:00 P.M. EST FRIDAY 7 FEBRUARY 2025 FOR TONIGHT AND SATURDAY. THE NEXT SCHEDULED SYNOPSIS WILL BE ISSUED AT 3:00 A.M. EST SATURDAY. SYSTEMS POSITION. AT 3:00 P.M. EST TODAY INTENSIFYING TROUGH LOCATED ON A LINE NORTH-SOUTH OVER THE GULF OF ST. LAWRENCE. BY 4:00 A.M. EST SATURDAY DEPARTING TROUGH LOCATED ON A LINE NORTH-SOUTH OVER LABRADOR SEA. AT 3:00 P.M. EST TODAY RIDGE LOCATED ON A LINE NORTHWEST-SOUTHEAST OVER THE SOUTHERN GREAT LAKES. BY 7:00 P.M. EST SATURDAY RIDGE LOCATED FROM THE GULF OF MAINE TO JAMES BAY. END